JACKSON, Wyo. — The Town of Jackson has released a Request for Proposals (RFP) for a single provider to install a Specified Grid-Interactive Solar Electric Power System at Jackson’s Core Maintenance facility on Karns Meadow Drive.

Completing the project will take the Town one step closer to its goal of net-zero emissions by 2030.

The Town shared that they are looking to work with a single-entity firm with “the proven experience and capability to achieve the highest quality, lowest cost, and best practices in solar construction services relating to design, labor, and materials,” which will be required to install the system at the facility.

According to a press release the system will include, but not be limited to: “photovoltaic modules, mounting support systems, inverter(s), wiring, conduit, disconnects, and web-based monitoring equipment to be installed at the site location.”

Proposals will be accepted starting Thursday, Oct. 8. Town Council will choose an entity on Monday, Nov. 16, and will announce its selection publicly the following day: Tuesday, Nov. 17. The projected completion date for the solar project is Oct. 27, 2027.

For further information regarding the RFP project information, interested parties should contact Ecosystem Stewardship Administrator Tanya Anderson at tanderson@jacksonwy.gov.

Hannah is a Buckrail Staff Reporter and freelance web developer and designer who has called Jackson home since 2015. When she’s not outside, you can probably find her eating a good meal, playing cribbage, or at one of the local yoga studios. She’s interested in what makes this community tick, both from the individual and collective perspective.